Avaya MCC1 Installation And Upgrades page 474

Media gateways installation and avaya definity server si upgrades made easy
Hide thumbs Also See for MCC1:
Table of Contents

Advertisement

Bring the System Online
Task List: Administer the System
3
Press Enter.
Figure 177: Typical Daylight Savings Time Rules
DAYLIGHT SAVINGS RULES
Rule
0:
No Daylight Savings
1:
Start: first Sunday___ on or after April____ 1 at _3:00
Stop:
2:
Start: first Sunday___ on or after April___ 1
Stop:
3:
Start: first _________ on or after ________ __ at __:__
Stop:
4:
Start: first _________ on or after ________ __ at __:__
Stop:
5:
Start: first _________ on or after ________ __ at __:__
Stop:
6:
Start: first _________ on or after ________ __ at __:__
Stop:
7:
Start: first _________ on or after ________ __ at __:__
Stop:
Return to Task List
Set Date and Time
Return to Task List
1
Type
set time
2
Verify the screen displays the Date and Time screen. See
Screen,
3
Type the day of the week in English (Sunday through Saturday) and press Tab to move to next
field. See
names.
4
The cursor is positioned on the Month: field. Type the current month in English (January
through December). See
After the month is entered, press Tab to move to next field.
5
The cursor is positioned on the Day of the Month: field. Type the day of month (1 through
31) and press Tab to move to the next field.
6
The cursor is positioned on the Year: field. Type the current year and press Tab to move to the
next field.
7
The cursor is positioned on the Hour: field. Type the current hour for a 24-hour clock. See
19, Conversion to 24-Hour Clock,
8
The cursor is positioned on the Minute: field. Type current minute (0 through 59). Seconds
cannot be set.
9
Type standard or daylight savings in the Type field.
10
Type the rule (number) in the Daylight Savings Rule field.
11
Press Enter when the information is correct
474
Change Day
first Sunday___ on or after October_ 25 at _3:00
first Sunday___ on or after October_ 25 at _3:00
first _________ on or after ________ __ at __:__
first _________ on or after ________ __ at __:__
first _________ on or after ________ __ at __:__
first _________ on or after ________ __ at __:__
first _________ on or after ________ __ at __:__
and press Enter.
on page 475. The cursor is positioned on the Day of the Week: field.
Table 17, English Day of the Week Names,
Table 18, English Month Names,
on page 476. Press Tab to move to the next field.
Month___Date Time____Increment
at _4:00
Figure 178, Typical Date and Time
on page 475 for English day of the week
on page 475 for English month names.
.
SI Installation and Upgrades
01:00
01:00
Table
June 2004

Advertisement

Table of Contents
loading

This manual is also suitable for:

Scc1

Table of Contents