Avaya MCC1 Installation And Upgrades page 340

Media gateways installation and avaya definity server si upgrades made easy
Hide thumbs Also See for MCC1:
Table of Contents

Advertisement

Install and Connect MCC1 (Multicarrier) Cabinet
Task List: Connect AC power and ground
Connect Small Battery Holdover
Return to Task List
Connect the small battery holdover cable to J20. See
page 341.
Figure 92: Power Distribution Unit (J58890CH)
pcdf010 KLC 020599
Figure notes
1
Connect small battery holdover cable
(or temperature sensor cable from
large battery cabinet) to J20
2
Carrier Circuit Breakers
3
Ground Terminal Block
4
Connect -48 VDC Return - 1 AWG (50
2
mm
) red cable here.
Return to Task List
340
Figure 93, Power Distribution Unit (J58890CH),
3
1
5
6
5
Connect -48 VDC - 1 AWG (50 mm
black cable
6
1 AWG (50 mm
large battery cabinet. For cables greater
than 50 ft (15.2 m), contact your Avaya
representative.
7
Ground Terminal Block
8
To AC load center or approved single-point
ground block
SI Installation and Upgrades
2
7
4
8
2
)
2
) 50 ft (15.2 m) cable to
June 2004
on

Advertisement

Table of Contents
loading

This manual is also suitable for:

Scc1

Table of Contents