Avaya MCC1 Installation And Upgrades page 359

Media gateways installation and avaya definity server si upgrades made easy
Hide thumbs Also See for MCC1:
Table of Contents

Advertisement

Connect Critical Reliability CSS-Connected System with 1 Switch Node
Return to Task List
Figure 107, Critical-Reliability CSS-Connected with 1 Switch Node,
optic cabling between cabinets. The cable between port slots 1 and 2 on each switch node is a metallic
cable (H600-278).
Connect the 2 groups of 1 to 15 cables between the PPN and each EPN in an alternating port slot order:
20, 3; 19, 4; 18, 5; and so forth.
Figure 107: Critical-Reliability CSS-Connected with 1 Switch Node
Figure notes
1
Cabinet 1 (PPN with 1 Duplex Switch Node)
2
Cabinet 2 through 16 (EPN)
Return to Task List
SI Installation and Upgrades
June 2004
Install and Connect MCC1 (Multicarrier) Cabinet
Connect Fiber Optic Interconnect Cabling
on page 359 shows typical fiber
3
H600-278 Metallic Cable
4
To other EPNs
359

Advertisement

Table of Contents
loading

This manual is also suitable for:

Scc1

Table of Contents