Busying out the DS1 circuit pack

Now take the DS1 circuit out of service.
1
Once you are sure that the DS1 circuit pack and ICSU are functioning correctly, go to the
management terminal and busy out the DS1 circuit pack by typing busyout board UUCSS,
where UU is the cabinet number, C is the carrier letter, and SS is the slot number of the DS1
board.

Administering the DS1 for the test

1
At the management terminal, open the DS1 administration form. Type change ds1 UUCSS,
where UU is the cabinet number, C is the carrier letter, and SS is the slot number of the DS1
board.
2
Make sure that the near-end csu type field is set to
3
Change to page 2 of the DS1 administration form, and confirm that the value of the TX LBO
field is
0dB
4
If the value of the TX LBO field is not
to 0dB for testing.
5
Press Enter to make the changes, CANCEL to quit without changes.

Testing the integrity of the loopback circuit

Now perform the first part of the actual loopback test.
1
At the management terminal, enter test ds1-loop location cpe-loopback-jack.
The loopback jack powers up. Active, DS1 facility alarms (if any) clear. After about 20 seconds,
the first set of results appears on the terminal.
2
If
FAIL
the loopback jack or the loopback jack may itself be faulty. Isolate the problem by replacing the
loopback jack and repeating
3
If
FAIL
the cable between the ICSU and the loopback jack. Then repeat
4
When
PASS
integrity of transmitted data.

Testing the integrity of data sent over the loop

Now perform the second part of the test, checking for data errors.
NOTE:
The loss of signal (LOS) alarm (demand test #138) is not processed during this test while
the 3-in-24 pattern is active.

Clearing the results of previous tests

1
Zero out the bit-error counter. At the management terminal, enter clear meas ds1 loop
location.
2
Zero out the performance measurement counter. At the management terminal, enter clear meas
ds1 log location.
3
Zero out the ESF error count. At the management terminal, enter clear meas ds1 esf
location.
SI Installation and Upgrades
June 2004
.
appears on the terminal display, there may be a fault in the wiring between the ICSU and
Step
1.
still appears after the loopback jack has been replaced, suspect a wiring problem. Replace
appears on the terminal, proceed with the second part of the test, checking the
integrated
, record the current value. Then set the TX LBO field
0dB
Step
Adjuncts and Peripherals
DS1/T1 CPE loopback jack
.
1.