Install and Connect MCC1 (Multicarrier) Cabinet
Connect Fiber Optic Interconnect Cabling
Return to Task List
Connect High-Reliability CSS-Connected System with 1 Switch Node
Return to Task List
Figure 106, High-Reliability CSS-Connected with 1 Switch Node,
cabling between cabinets. The cable between the EI and SNI on the PPN cabinet is a pre-installed
metallic cable (H600-278).
Connect the cables between the PPN cabinet and each EPN cabinet in an alternating port slot order: 3, 19;
4, 18; 5, 17; and so forth. Cabinet 1 is a PPN with 1 Switch Node.
Figure 106: High-Reliability CSS-Connected with 1 Switch Node
Figure notes
1
Cabinet 1 (PPN with 1 Switch Node)
2
Cabinet 2 through 15 (EPN)
Return to Task List
358
on page 358 shows typical fiber optic
3
H600-278 Metallic Cable
4
To other EPNs
SI Installation and Upgrades
June 2004