Avaya MCC1 Installation And Upgrades page 587

Media gateways installation and avaya definity server si upgrades made easy
Hide thumbs Also See for MCC1:
Table of Contents

Advertisement

b
Open the License Installation Tool (LIT) application at your laptop/PC.
c
Use the LIT instructions to add a switch connection profile to the tool.
d
Use the LIT instructions to install the License File on the switch.
e
If the system has IP endpoints registered, and you unplugged the Ethernet cable from the
TN799 (C-LAN) circuit pack, replug the cable.
This re-registers the IP endpoints.
Save Translations (CallVisor ASAI)
Return to Task List
1
If the system is high or critical reliability, type
system is in the
2
Type
save translation
information in memory and write it to the translation cards.
Add Circuit Packs (CallVisor ASAI)
Return to Task List
1
Determine port assignment of circuit packs to be added.
2
Install the appropriate circuit packs in assigned cabinet slot (as required).
NOTE:
A vacant port is required on a TN556D ISDN—BRI circuit pack.
Return to Task List
Install Cables (CallVisor ASAI)
Return to Task List
1
Install cables from cabinet to the MDF as required.
Enter Added Translations (CallVisor ASAI)
Return to Task List
1
Administer the required translation data using the forms listed under "Adjunct/Switch
Applications Interface (ASAI)" in the Administrator's Guide for Avaya™ Communication
Manager (555-233-506).
Resolve Alarms (CallVisor ASAI)
Return to Task List
1
Examine the alarm log.
2
Resolve any alarms that may exist using the Maintenance for Avaya DEFINITY® Server SI (555-
233-123) documentation for your system.
SI Installation and Upgrades
June 2004
mode.
active/standby
and press Enter. This instructs the system to take all translation
Install Additional Hardware
Task List: Add CallVisor ASAI
and press Enter to verify that the
status system 1
587

Advertisement

Table of Contents
loading

This manual is also suitable for:

Scc1

Table of Contents