Suzuki Ignis Service Manual page 3644

Rg413
Table of Contents

Advertisement

High Speed and Low Speed Gear Shift Shafts
Inspection
1) Using feeler gauge, check clearance between fork (1) and
sleeve (2) and replace those parts if it exceeds limit below.
NOTE:
For correct judgement of parts replacement, carefully
inspect contact portion of fork and sleeve.
Clearance between fork and sleeve
Service limit "a" : 1.0 mm (0.039 in.)
2) Insert each gear shift shaft into case and check that it moves
smoothly. If it doesn't, correct using oilstone, reamer or the
like.
5th & Reverse Gear Shift Shafts Disassembly
and Assembly
Disassembly
Disassemble component parts using special tool and hammer.
Special tool
(A) : 09922-85811
Assembly
Replace or correct parts as required and assemble shafts making
sure that component parts are in proper order as shown in figure.
NOTE:
• Distinguish reverse gear shift arm spring (Blue) (2)
from low speed locating spring (Yellow).
• Install 2 steel balls (3) in reverse gear shift arm (1) with-
out fail.
• Drive in spring pin for reverse gear shift arm (1) facing
slit A toward front.
4. Spring pin
5. 5th & reverse gear shift shaft
6. 5th & reverse gear shift yoke
MANUAL TRANSAXLE 7A1-39
7. 5th & reverse gear shift guide shaft
8. 5th gear side
A: Face pin slit toward 5thn gear side

Advertisement

Table of Contents
loading

Table of Contents