Suzuki Ignis Service Manual page 3411

Rg413
Table of Contents

Advertisement

6A1-22 ENGINE MECHANICAL (M13 ENGINE)
4
2
1,(a)
2,(a)
3
2
1
1
Intake Manifold Removal and Installation
Removal
1) Remove throttle body referring to "Throttle Body Removal
and Installation" in this section.
2) Disconnect MAP sensor coupler (1).
3) Disconnect the following hoses :
• Brake booster hose (2) from cylinder head cover
• PCV hose (3) from PCV valve
4) Disconnect EGR pipe (4) from EGR valve.
5) Remove intake manifold (1) and EGR pipe (2) from cylinder
head, and then remove its gasket and O-ring.
Installation
Reverse removal procedure for installation noting the followings.
• Use new intake manifold O-ring.
• Use new EGR pipe gasket and O-ring.
• Tighten bolts (1) and nuts (2) to specified torque.
Tightening torque
Intake manifold bolts and nuts
(a) : 25 N·m (2.5 kg-m, 18.0 lb-ft)
• Check to ensure that all removed parts are back in place.
Reinstall any necessary parts which have not been rein-
stalled.
• Adjust accelerator cable play referring to "Accelerator cable
adjustment" in Section 6E1.
• Refill cooling system referring to "Cooling System Flush and
Refill" in Section 6B.
• Upon completion of installation, turn ignition switch ON but
engine OFF and check for fuel leaks.
• Finally, start engine and check for engine coolant leaks.

Advertisement

Table of Contents
loading

Table of Contents