Suzuki Ignis Service Manual page 3537

Rg413
Table of Contents

Advertisement

6E1-20 ENGINE AND EMISSION CONTROL SYSTEM
4
2
5
1
(b)
5
1
(a)
3
2
Oil control valve removal and installation
REMOVAL
Remove oil gallery pipe No.1 (1) and oil control valve (2) from tim-
ing chain cover (3).
INSTALLATION
1) Install new O-ring (4) to oil control valve.
2) Install oil control valve to timing chain cover.
Tighten nuts to specification.
Tightening torque
Oil control valve mounting nuts
(a): 11 N·m (1.1 kg-m, 8.0 lb-ft)
3) Install oil gallery pipe No.1 with new copper washers (5) to
timing chain cover.
Tighten bolts to specification.
Tightening torque
Oil gallery pipe No.1 bolts
(b): 30 N·m (3.0 kg-m, 21.5 lb-ft)
Oil control valve inspection
1) Inspect strainer (1) and mating surface (2) of oil control valve
for clog or damage. Clean oil control valve if clog or foreign
matter is present on strainer or mating surface of oil control
valve.
Replace oil control valve if its mating surface is damaged.
2) Check resistance between terminals of oil control valve.
Resistance: 6.7 – 7.7 Ω (at 20°C (68°F))

Advertisement

Table of Contents
loading

Table of Contents