Suzuki Ignis Service Manual page 3595

Rg413
Table of Contents

Advertisement

6H-8 CHARGING SYSTEM
LOAD CHECK
1) Run engine at 2,000 rpm and turn on head light and heater
motor.
2) Measure current and if it is less than 20 A repair or replace
generator.
Overcharged battery
1) To determine battery condition, refer to "Battery Description"
in this section.
2) If obvious overcharge condition exists as evidenced by
excessive spewing of electrolyte, measure generator B ter-
minal voltage at engine 2,000 rpm.
3) If measured voltage is higher than upper limit value, disas-
semble generator.
4) Check ground of brushes. If brushes are not grounded,
replace IC regulator. Then check field coil for grounds and
shorts.
A: Regulated voltage (V)
B: Heatsink temperature (°C)

Advertisement

Table of Contents
loading

Table of Contents