Suzuki Ignis Service Manual page 3425

Rg413
Table of Contents

Advertisement

6A1-36 ENGINE MECHANICAL (M13 ENGINE)
1
2
2
1
2
1
(a)
(b)
4
(b)
5
8) Remove cap (1) from timing chain cover (2).
9) Remove timing chain cover.
10) Remove oil gallery pipe No.1 (1) and oil control valve (2)
3
Installation
1) Clean sealing surface on timing chain cover, cylinder block
2) Install new O-ring (1) to oil control valve (2).
3) Install oil control valve to timing chain cover (3).
Tightening torque
Oil control valve mounting nuts
(a) : 11 N·m (1.1 kg-m, 8.0 lb-ft)
4) Install oil gallery pipe No.1 (4) with new copper washers (5)
Tightening torque
Oil gallery pipe No.1 bolts
(b) : 30 N·m (3.0 kg-m, 21.5 lb-ft)
3
from timing chain cover (3).
and cylinder head.
Remove oil, old sealant and dust from sealing surface.
Tighten nuts to specification.
to timing chain cover.
Tighten bolts to specification.

Advertisement

Table of Contents
loading

Table of Contents