Winnebago 1987-1989 LeSharo Service Manual page 448

Winnebago 1987-1989 lesharo; 1987-1989 phasar; 1987-1989 utility van motor home
Table of Contents

Advertisement

REBUILD
FINAL ASSEMBLY
In the main housing:
• Fit the two interlocks (75) between the fork shaft
bores:
- 1st/2nd and 3rd/4th
Replacing the bearings
1st arrangement:
thickness:
17 mm
2nd arrangement:
thickness:
17.5 mm
When replacing a bearing, it must be identical to
the one removed.
Removing:
• Remove the circlips and push out the bearings
with a tube from inside the housing.
Refitting:
• Fit the bearings on the press,taking the load on
the outer race (0.61 mm).
• The bearing plastic cage should face towards
the outside of the housing.
• Fit the circlip, ensuring that it enters correctly
into its groove in the housing.
G3-38
1
.1
i
I
)

Advertisement

Table of Contents
loading

This manual is also suitable for:

1987-1989 phasar1987-1989 utility van

Table of Contents