Winnebago 1987-1989 LeSharo Service Manual page 378

Winnebago 1987-1989 lesharo; 1987-1989 phasar; 1987-1989 utility van motor home
Table of Contents

Advertisement

FINAL DRIVE REBUILD
REASSEMBLY
INSTALL:
• Torque converter seal (27). Use tool B.Vi. 962 - see
page F3-16 for procedure.
7
B. Vi.
962
1
f·····.·.·.··l
r,'
,
1
• Press the needle bearing as indicated
(7) and
recess to a dimension of 37 mm (1.45 in).
• step down drive shaft (12).
• output shaft (8).
F7-20
.j
I
j
I
.
J

Advertisement

Table of Contents
loading

This manual is also suitable for:

1987-1989 phasar1987-1989 utility van

Table of Contents