Winnebago 1987-1989 LeSharo Service Manual page 422

Winnebago 1987-1989 lesharo; 1987-1989 phasar; 1987-1989 utility van motor home
Table of Contents

Advertisement

REBUILD
DISASSEMBLY
• Unlock the nut (5) and remove it with tool B.Vi.
903 .
• Using Tools B.Vi. 28-01 and B.Vi. 48, extract the
pinion bearing (4).
REMOVE:
• The speedometer drive pinion (64) and its shaft
(65).
• Spread the lugs (C) that secure the pinion to the
shaft.
• Remove the shaft.
• The pinion must be replaced with a new one each
time it is removed.
G3-12
-I
i
I
_I
. 1
J
1
J
1
i
J
- I
\
J
I
J

Advertisement

Table of Contents
loading

This manual is also suitable for:

1987-1989 phasar1987-1989 utility van

Table of Contents