Winnebago 1987-1989 LeSharo Service Manual page 431

Winnebago 1987-1989 lesharo; 1987-1989 phasar; 1987-1989 utility van motor home
Table of Contents

Advertisement

FINAL DRIVE REBUILD
REASSEMBLY
I
Mount the ring gear to the differential
housing using
new bolts.
Torque tighten the ring gear bolts. (See G1-4)
Press the ball bearing onto the shaft (34) a few
millimeters at the planetary gear end to center it.
Lift up the assembly to the differential
housing
(bearing (34) not being in its working position.)
Coat the half-casing joint
faces with
anaerobic
sealer, fit the other half-casing and assemble them
with several bolts.
Hand tighten these bolts only at this stage.
Mount the differential
ring nut (with its seal and its
threads coated with gasket sealer) using castellated
wrench a.Vi. 645.
Tighten the ring nut until it contacts the differential
bearing outer track ring.
Complete the assembling of ball bearing (34) driving
it on until it touches shoulder (E) in the casing.
Unscrew the differential
ring nut one half-turn.
Torque tighten the casing bolts. (See G1-4)
Place the following
at the planetary gear end:
- circlip
- plastic bushing
G3-21
B,Vi. 645

Advertisement

Table of Contents
loading

This manual is also suitable for:

1987-1989 phasar1987-1989 utility van

Table of Contents