COUPLING TRANSMISSION TO FINAL DRIVE
ADJUSTING THE END FLOAT
Once the adjustment
has been made, set the
mechanism in the "Park" position.
FINAL REASSEMBLY PROCEDURE
I
i
i
REASSEMBLY
- Check that the 2 dowel bushings are fitted and
that their locations are in good condition.
- Clean the case joint faces and coat them with
anaerobic
sealant
compound.
Install
a
replacement paper gasket.
Secure the transfer case to the final drive case and
tighten the bolt to 2.0 daNm (15 Ib./ft.)
- Check that the 4 magnets are in place in the fluid
pan.
- Mount the pan and torque tighten the bolts to 0.6
daNm (4.5 Ib./ft.)
F6-4
1
I
j
fj
1 .. _.•
---J
i
J
j
I
_I