ABB Relion 650 Series Technical Manual page 281

Hide thumbs Also See for Relion 650 Series:
Table of Contents

Advertisement

1MRK 506 326-UUS B
The first criterion means that detection of failure in one phase together with high current for the
same phase will set the output. The measured phase current is used to reduce the risk of false
fuse failure detection. If the current on the protected line is low, a voltage drop in the system (not
caused by fuse failure) is not by certain followed by current change and a false fuse failure might
occur.
The second criterion requires that the delta condition shall be fulfilled in any phase at the same
time as circuit breaker is closed. Opening circuit breaker at one end and energizing the line from
other end onto a fault could lead to wrong start of the fuse failure function at the end with the
open breaker. If this is considering to be an important disadvantage, connect the 52a input to
FALSE. In this way only the first criterion can activate the delta function.
Line distance protection REL650
Technical manual
© Copyright 2011 ABB Power Grids. All rights reserved
Section 9
Secondary system supervision
275

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rel650

Table of Contents