ABB DressPack IRB6650S Product Manual page 117

Table of Contents

Advertisement

7
8
Product manual - DressPack/SpotPack IRB 6650S
3HAC055424-001 Revision: C
2.2.8.2 Fitting the cable package IRBDP SW5 CE (SpotPack Basic)
Action
Fit the process cable package to the clamp
holder with plastic clamp. Position of cables
and hoses is shown in the figure.
CAUTION
Do not tighten the brass couplings for water
and air with excessive force.
Fit the process cable package to the connec-
tion box.
© Copyright 2004-2018 ABB. All rights reserved.
2 Installation
Note
Tightening torque, brass couplings 1/2":
31Nm
Tightening torque, brass couplings 3/8":
17Nm
Shown in the figure
Location of the cable
package on page
114.
xx0800000079
Positions:
A: PROC 1 (blue)
B: PROC 2 (green)
C: PROC 3 (red)
D: PROC 4 (black)
E: Signal cable
F: Weld cable
xx0800000082
Parts:
A: Connection box
Continues on next page
Continued
117

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Spotpack irb6650s

Table of Contents