The figure shows the cable package IRBDP SW5 CE.
xx0800000087
A
B
C
D
E
F
G
Required equipment
Equipment
Standard Toolkit,
DressPack/SpotPack
Product manual - DressPack/SpotPack IRB 6650S
3HAC055424-001 Revision: C
3.3.2 Preventive inspection, DressPack upper arm
Adjustable bracket
Gripping clamp
Axis 3 bracket
Bracket
Process cable package IRBDP SW5 CE, upper end
Ball joint housing
Process cable support axis 6
Article number
3HAC17290-7
© Copyright 2004-2018 ABB. All rights reserved.
3 Maintenance
Note
The contents are defined in section
Toolkits, DressPack/SpotPack on
page
355.
Continues on next page
Continued
213