ABB DressPack IRB6650S Product Manual page 282

Table of Contents

Advertisement

4 Repair
4.2.10 Replacing the cable package IRBDP SW6 LE LeanID
Continued
10
11
12
13
Continues on next page
282
Action
Fit the R1.CP/CS cable to the customer plate.
Secure the R1.CP/CS connector.
Connect the hose connectors to the customer
plate.
CAUTION
Do not tighten the brass couplings for water and
air with excessive force.
CAUTION
Make sure that no cables or hoses are twisted or
strained. Reroute if necessary.
Connect the rest of the cable connectors to the
customer plate.
CAUTION
Make sure that no cables or hoses are twisted or
strained. Reroute if necessary.
© Copyright 2004-2018 ABB. All rights reserved.
Note
xx1400001142
xx1400001143
Screw, M6x20 8.8-A2F (2 pcs)
Tightening torque, brass couplings
1/2": 31 Nm
xx1200000088
Product manual - DressPack/SpotPack IRB 6650S
3HAC055424-001 Revision: C

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Spotpack irb6650s

Table of Contents