2 Installation
2.6.1 Installation of Water and air unit
2.6 Water and air unit
2.6.1 Installation of Water and air unit
Overview
This section details how to install the Water and Air unit. The figures show IRB
6700, but the principle is the same for other robot types as well.
Location of the Water and Air unit
The Water and Air unit is located on top of the robot base, as shown in the figure.
xx1300002321
General technical data
The table below shows technical data of the water and air pressure:
Parameter
Water operating pressure
Air operating pressure
Continues on next page
192
© Copyright 2004-2018 ABB. All rights reserved.
Value
Max. 0.6 MPa / 87 PSI
Max. 1.0 MPa / 145 PSI
Product manual - DressPack/SpotPack IRB 6650S
3HAC055424-001 Revision: C