5 Repair
5.9.1 Replacing the axis-1 gearbox
Continued
8
9
10
Continues on next page
478
Action
Visually verify through the axis-1 motor
hole that the hole is aligned with the pinion
hole in the gearbox.
Lower the arm system slowly until the
heads of the gearbox attachment screws
are starting to disappear inside the frame
edge.
Verify visually from the side and from the
front/back that the frame is coming down
completely level against the gearbox. If the
frame is somewhat tilted, adjust the lifting
position with the overhead crane.
Note
While lowering the complete arm system,
check that the cylindrical pin is fitted cor-
rectly.
Lower the complete arm system into posi-
tion on top of the gearbox.
© Copyright 2023 ABB. All rights reserved.
Note
xx1700002040
xx2200001613
xx1700002042
xx1700002043
Product manual - IRB 6730
3HAC085699-001 Revision: B