ABB IRB 1010 Product Manual page 260

Table of Contents

Advertisement

5 Repair
5.5.2 Replacing the axis-3 motor
Continued
4
5
6
7
Continues on next page
260
Action
Route the cable package.
Route the cable package up into the axis
4 (direction 1).
Pull the axis-4 motor connectors out from
the robot rear (direction 2).
Pull the main cable harness out from the
axis 3-4 assembly unit and to the wrist unit
direction (direction 3).
Install the timing belt to the pulleys and verify that
the belt runs correctly in the grooves of the pul-
leys.
Install an M4x20 or longer adjustment screw to
the motor.
Note
Do not insert the entire screw to the hole.
The screw shall be installed with proper force to
avoid shaft rotation.
Use a handheld dynamometer hooking to the
screw and pull the dynamometer to reach the ini-
tial referenced force.
© Copyright 2022 ABB. All rights reserved.
Note
xx2200000100
xx2200000099
xx2200000544
Initial referenced force for used
belt: 14.1±1 N (for reference only)
Initial referenced force for new belt:
20.2±1 N
xx2200000545
Product manual - IRB 1010
3HAC081964-001 Revision: B

Advertisement

Table of Contents
loading

Table of Contents