ABB IRB 1010 Product Manual page 218

Table of Contents

Advertisement

5 Repair
5.4.3 Replacing the axis 3-4 assembly unit
Continued
5
Refitting the axis-5 motor
1
2
3
Continues on next page
218
Action
Connect the power supply to axis-3 motor and
release the axis-3 brake to move the axis 3 to zero
position. Then, disconnect the power supply.
Note
The robot is not connected to the controller during
replacement, power must be supplied to the con-
nector R1.MP according to the section
power to connector R1.MP on page
Action
Arrange the cable package as follows:
Cablings out from the process hub
- air hoses
- CP/CS cabling (connector R2.C1)
- axis-5 motor cablings (connectors MP5
and FB5)
Cablings out from the right side of wrist
unit (facing the tool flange)
- axis-6 motor cablings (connectors MP6
and FB6)
- pressure relief pipe connector
Check that:
all assembly surfaces are clean and without
damages
the motor is clean and undamaged.
Reconnect the connectors.
FB5
Tip
See the number markings on the connectors for
help to find the corresponding connector.
© Copyright 2022 ABB. All rights reserved.
Note
Supplying
56.
Note
xx2200000538
Product manual - IRB 1010
3HAC081964-001 Revision: B

Advertisement

Table of Contents
loading

Table of Contents