ABB IRB 1010 Product Manual page 211

Table of Contents

Advertisement

3
4
Securing the cable package in axis 3
1
Product manual - IRB 1010
3HAC081964-001 Revision: B
Action
Refit the swing top cover.
Connect the power supply to axis-2 motor and
release the axis-2 brake to move the axis 2 to zero
position. Then, disconnect the power supply.
Note
The robot is not connected to the controller during
replacement, power must be supplied to the con-
nector R1.MP according to the section
power to connector R1.MP on page
Action
Route the cable package through the axis 3-4 as-
sembly unit.
© Copyright 2022 ABB. All rights reserved.
5.4.3 Replacing the axis 3-4 assembly unit
Note
Screw: M3x10 12.9 Lafre
2C2B/FC6.9 (2 pcs)
Tightening torque: 1.2 Nm
xx2200000540
Supplying
56.
Note
xx2200000097
Continues on next page
5 Repair
Continued
211

Advertisement

Table of Contents
loading

Table of Contents