ABB DressPack IRB 6640 Product Manual page 94

Table of Contents

Advertisement

2 Installation
2.2.8 Fitting the cable packages IRBDP MH2 LE and IRBDP SW2 LE
Continued
Required equipment
The following equipment is required for installation of the cable package.
Equipment
Cable package IRBDP MH2 LE
Cable package IRBDP SW2 LE
Circuit diagram
Required tools
Equipment
Standard toolkit, DressPack/Spot-
Pack
Other tools and procedures may
be required. See references to
these procedures in the step-by-
step instructions below.
Required consumables
Consumable
Locking liquid
Procedures
Use this procedure to fit the cable packages IRBDP MH2 LE and SW2 LE. Screws
are supplied with the kit.
1
2
Continues on next page
94
Action
DANGER
Turn off all:
electric power supply
hydraulic pressure supply
air pressure supply
to the robot, before entering the robot
working area.
CAUTION
The cable package is sensitive to mechanic-
al damage. They must be handled with care,
especially the connectors, in order to avoid
damaging them.
© Copyright 2007-2018 ABB. All rights reserved.
Art. no.
Note
For spare part num-
A number of versions are
ber see chapter:
available.
Spare parts on
page
339.
For spare part num-
A number of versions are
ber see chapter:
available.
Spare parts on
page
339.
3HAC026209-001
Article number
Note
3HAC17290-7
The contents are defined in sec-
tion
Pack on page
These procedures include refer-
ences to the tools required.
Article number
Note
3HAB7116-1
Used for locking screws. (Loctite
243)
Note
Product manual - DressPack/SpotPack IRB 6640
Toolkits, DressPack/Spot-
335.
3HAC028638-001 Revision: K

Advertisement

Table of Contents
loading

This manual is also suitable for:

Spotpack irb 6640

Table of Contents