ABB DressPack IRB 6640 Product Manual page 132

Table of Contents

Advertisement

2 Installation
2.2.13 Fitting the cable package IRBDP SW5 CE (SpotPack Basic)
Continued
9
10
11
12
13
14
15
16
132
Action
Fit the process cable package to the water
and air unit.
CAUTION
Do not tighten the brass couplings for water
and air with excessive force.
Fit the process cable package to the lower
bracket with the spiral hose clamp.
Secure the process cable package to the
side bracket balancing cylinder with the
velcro straps.
Fit the process cable package to the grip-
ping clamp on the lower arm plate.
Secure the process cable package with the
velcro strap to the lower arm plate.
Fit the process cable package to the grip-
ping clamp on the adjustable bracket.
Fit the process cable package in the ball
joint housing on the adjustable bracket.
Fit the process cable package on the ball
joint housing on the process cable support
axis 6.
© Copyright 2007-2018 ABB. All rights reserved.
Note
Tightening torque, brass couplings 1/2":
31Nm
Tightening torque, brass couplings 3/8":
17Nm
xx0800000083
Parts:
A: Water and air unit
Shown in the figure
package on page
128.
Shown in the figure
package on page
128.
Shown in the figure
package on page
128.
Shown in the figure
package on page
128.
Shown in the figure
package on page
128.
Shown in the figure
package on page
128.
Shown in the figure
package on page
128.
Product manual - DressPack/SpotPack IRB 6640
3HAC028638-001 Revision: K
Location of the cable
Location of the cable
Location of the cable
Location of the cable
Location of the cable
Location of the cable
Location of the cable

Advertisement

Table of Contents
loading

This manual is also suitable for:

Spotpack irb 6640

Table of Contents