ABB DressPack IRB 6640 Product Manual page 185

Table of Contents

Advertisement

Water drain connection, Two water return (Only applicable to type S)
Use this procedure to connect the water drain connection with two water return,
to the Water and Air unit.
1
Hoses connecting Robot and Water and Air unit
Use this procedure to connect hoses between manipulator and Water and Air unit.
1
2
3
4
Product manual - DressPack/SpotPack IRB 6640
3HAC028638-001 Revision: K
Action
Connect the hose to the bulkhead fitting
with a G½" thread.
CAUTION
Do not tighten the brass couplings for water
and air with excessive force.
Note
Any rotation of the bulkhead fitting must be
avoided when mounting. Hold the outer part
of the bulkhead fitting with a suitable tool,
in order to prevent rotation.
Action
CAUTION
Do not tighten the brass couplings for water
and air with excessive force.
Connect Proc 1 on the Water and Air unit
with Proc 1 on the robot.
Connect Proc 2 on the Water and Air unit
with Proc 2 on the robot.
Connect Proc 3 on the Water and Air unit
with Proc 3 on the robot.
© Copyright 2007-2018 ABB. All rights reserved.
2 Installation
2.6.1 Installation of Water and air unit
Note
xx0600003349
Parts:
H: Bulkhead fitting
I: Outer part of bulkhead fitting
Note
Tightening torque, brass couplings 1/2":
31Nm
Tightening torque, brass couplings 3/8":
17Nm
Shown in the figure in section
tions to Water and Air unit, type S on
page
181.
Shown in the figure in section
tions to Water and Air unit, type Sb on
page
182.
Shown in the figure in section
tions to Water and Air unit, type S on
page
181.
Shown in the figure in section
tions to Water and Air unit, type Sb on
page
182.
Shown in the figure in section
tions to Water and Air unit, type S on
page
181.
Shown in the figure in section
tions to Water and Air unit, type Sb on
page
182.
Continues on next page
Continued
Connec-
Connec-
Connec-
Connec-
Connec-
Connec-
185

Advertisement

Table of Contents
loading

This manual is also suitable for:

Spotpack irb 6640

Table of Contents