ABB DressPack IRB 6640 Product Manual page 259

Table of Contents

Advertisement

3
4
5
6
Product manual - DressPack/SpotPack IRB 6640
3HAC028638-001 Revision: K
4.2.8 Replacement process cable package IRBDP SW4 UI (IRB66X0ID)
Action
Front:
Refit the cover on the R3.WELD connect-
or, M5x16 screws, (2 pcs).
Front:
Refit the R3.PROC1-5 hoses on its cover.
(fittings, 5 pcs).
Front:
Refit the process cable package in the
holder front, M6x60 screws, (4 pcs).
Note
The screws shall not be tightened fully at
this point!
Front:
Refit the bearing holders, M6x30 screws,
(2 pcs).
Note
Fit the bearing holders correctly!
The bearing holder shall be fitted with the
flange towards the bearing, as shown in
illustration.
© Copyright 2007-2018 ABB. All rights reserved.
Note
See markings on cover and hoses for cor-
rect refitting.
Note
Do not twist hoses!
xx0500001944
Parts:
A: Holder front
B: Hex socket head cap screw M6x60
(4 pcs)
A
xx0500001943
Parts:
A: Bearing holder correct way
Continues on next page
4 Repair
Continued
259

Advertisement

Table of Contents
loading

This manual is also suitable for:

Spotpack irb 6640

Table of Contents