ABB DressPack IRB 6640 Product Manual page 256

Table of Contents

Advertisement

4 Repair
4.2.8 Replacement process cable package IRBDP SW4 UI (IRB66X0ID)
Continued
3
4
5
Continues on next page
256
Action
Front:
Put a guide pin (M6x90) in the lower
hole of the holder front.
Back and front together:
Place the cables and hoses - one after
the other - preferably in the following
order:
R3.WELD
R3.CP/CS/CBUS
R3.PROC1-5
Back:
Hold the spiral of the motor cable up
while the process cable package is in-
serted into the upper arm.
© Copyright 2007-2018 ABB. All rights reserved.
Note
xx0500002503
This will make it easier to find the holes for
the screws.
It will also make it easier to refit the process
cable package in the front part of the wrist.
If the connectors have covers fitted, remove
them.
Fix the cables and hoses with some tape or
straps. This will make it easier to guide the
process cable package through the upper arm.
xx0500001948
Parts:
A: Spiral of motor cable
B: Groove in the cable and hose guide
C: Process cable package
Product manual - DressPack/SpotPack IRB 6640
3HAC028638-001 Revision: K

Advertisement

Table of Contents
loading

This manual is also suitable for:

Spotpack irb 6640

Table of Contents