ABB DressPack IRB 6640 Product Manual page 115

Table of Contents

Advertisement

15
16
17
Product manual - DressPack/SpotPack IRB 6640
3HAC028638-001 Revision: K
Action
Spot welding applications only:
Fit the weld power cable to the rear of the
process plate, with two attachment screws
using the weld connector bracket.
Do not tighten the attachment screws at this
point.
Screws are supplied with the kit.
Fit the connectors to the customer plate and
process plate previously fitted to the connec-
tion plate, base.
Screws are supplied with the kit.
CAUTION
Do not tighten the brass couplings for water
and air with excessive force.
Tip
In order to get the weld power cable fitted in
the right position on the plate customer, first
connect the floor weld cable to the weld
power cable and use it as a guide.
Before tightening the weld power attachment
screws, make sure that the cable connector
is evenly positioned in the hole of the process
plate.
Tighten the weld power cable attachment
screws.
© Copyright 2007-2018 ABB. All rights reserved.
2.2.10 Fitting the cable package IRBDP SW2 CE
Note
B
xx0300000196
Parts (as seen from above):
A: Weld power cable (behind
process plate)
B: Weld connector bracket
C: Process plate
D: Screw holes in process plate
E: Attachment screws M6x30
quality 8.8-A2F (2 pcs)
F: Guide pins on weld connector
bracket
Tightening torque, brass couplings 1/2":
31Nm
Tightening torque, brass couplings 3/8":
17Nm
Shown in the figure in section
of cable package - IRBDP SW2 CE on
page
107.
Recheck all cables and hoses for
straining or twisting. Reroute if required!
Screw dimension: M6x20
The weld power attachments screws are
shown in figure above!
2 Installation
Continued
C
F
A
D
E
Location
Continues on next page
115

Advertisement

Table of Contents
loading

This manual is also suitable for:

Spotpack irb 6640

Table of Contents