ABB DressPack IRB 6640 Product Manual page 99

Table of Contents

Advertisement

11
12
13
Product manual - DressPack/SpotPack IRB 6640
3HAC028638-001 Revision: K
2.2.8 Fitting the cable packages IRBDP MH2 LE and IRBDP SW2 LE
Action
Spot welding applications only:
Fit the weld power cable to the rear of the
process plate with two attachment screws,
using the weld connector bracket.
Do not tighten the attachment screws at this
point!
Screws are supplied with the kit.
Fit the connectors to the customer and pro-
cess plates, previously fitted to the connec-
tion plate base.
CAUTION
Do not tighten the brass couplings for water
and air with excessive force.
Tip
In order to get the weld power cable moun-
ted in the right position on the process plate,
first connect the floor weld cable to the weld
power cable and use it as a guide.
Before tightening the weld power attachment
screws, make sure that the cable connector
is evenly placed in the hole of the process
plate.
Tighten the weld power cable attachment
screws.
© Copyright 2007-2018 ABB. All rights reserved.
2 Installation
Note
C
F
A
B
xx0300000196
Parts (as seen from above):
A: Weld power cable (behind pro-
cess plate)
B: Weld connector bracket
C: Process plate
D: Screw holes in process plate
E: Attachment screws M6x30
quality 8.8-A2F (2 pcs)
F: Guide pins on weld connector
bracket
Shown in the figure in section
of lower arm cable package on page
Tightening torque, brass couplings 1/2":
31Nm
Tightening torque, brass couplings 3/8":
17Nm
Recheck all cables and hoses for strain-
ing or twisting. Reroute if required!
Screw dimension: M6x20 quality 8.8.A2F
(4 pcs to each plate).
The attachment screws of the weld power
cable are shown in the figure above.