Subaru Legacy 2004 Service Manual page 3307

Hide thumbs Also See for Legacy 2004:
Table of Contents

Advertisement

Installed tie-rod length L:
31 mm (1.22 in)
37) Inspect the gearbox as follows:
"A" Holding the tie-rod end, repeat lock to lock two
or three times as quickly as possible.
"B" Holding the tie-rod end, turn it slowly at a radius
one or two times as large as possible.
After all, make sure that the boot is installed in
specified position without deflation.
38) Remove the gearbox from ST.
ST1 926200000
STAND
ST2 34199AG000 BOSS D
39) Install the four pipes on gearbox.
(1) Connect the pipe A and B to four pipe joints
of gearbox.
Tightening torque:
#
13 N
m (1.3 kgf-m, 9.4 ft-lb)
Steering Gearbox [LHD Model]
L
PS-00097
A
B
PS-00098
POWER ASSISTED SYSTEM (POWER STEERING)
(2) Connect the pipe C and D to gearbox.
Tightening torque:
Pipe C: 15 N
Pipe D: 25 N
(2)
(1) Pipe C
(2) Pipe D
2. CONTROL VALVE ASSEMBLY
Specified steering grease:
VALIANT GREASE M2 (Part No. 003608001)
1) Clean all parts and tools before reassembling.
2) Apply a coat of specified power steering fluid to
the inner wall of valve housing.
(1) Apply fluid.
3) To avoid scratching the oil seal, apply a coat of
grease to the contact surface of installer and oil
seal.
4) Verify the oil seal direction.
Attach the oil seal to installer and position in valve
housing before pressing into place.
PS-37
#
m (1.5 kgf-m, 10.8 ft-lb)
#
m (2.5 kgf-m, 18.1 ft-lb)
(1)
(1)
PS-00525
PS-00169

Advertisement

Table of Contents
loading

Table of Contents