Safety Instructions - Avaya DECT R4 Installation And Administration Manual

Hide thumbs Also See for DECT R4:
Table of Contents

Advertisement

Installing and operating the IPBS and IPBL
Contents of the box
The box in which the IPBS2 is packed contains:
An IPBS2 with connectors for external antennas
A mounting bracket
Two screws with wall plugs
External antennas
Connect external antennas through the MCX connectors on the IPBS2 before following the
installation instructions in

Safety instructions

For safe and efficient operation, follow the operating instructions and adhere to all warnings and
safety precautions located on the product and this manual. Follow the operating instructions
and adhere to all warnings and safety precautions located on the product and this manual.
Only service persons must perform installation and service.
The voltage and frequency of the mains power socket must match the voltage and
frequency inscribed on the electrical rating label of the equipment.
Never install telephone wiring during a thunderstorm.
Note:
Do not touch or punch the IPBS/RFP signal and power pairs as 48Vdc or 24Vdc
Note:
is present on these wires at all times.
Ensure that the base station installation conforms to relevant national installation rules.
Disconnect all power sources before servicing the equipment.
Use only approved spare parts and accessories. Non approved parts might not work and
might cause damage or danger.
Only approved power supplies according to valid editions of EN/IEC/CSA/UL/AU/NZS
60950 when the IPBS/RFPs are powered by local power supplies.
72
Avaya DECT R4 - Installation and Maintenance Guide
Installing the base station
on page 80.
02/2016

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents