Installation Procedure - Avaya DECT R4 Installation And Administration Manual

Hide thumbs Also See for DECT R4:
Table of Contents

Advertisement

Installation procedure

1. Read chapters 4.1 and 4.2 before starting the installation.
2. Mount the device, see
3. Connect the suppy voltage, see
4. Access the module through the web interface, see
Hardware)
5. Fill in the required data, see
6. Connect to the equipment as required, see
Mounting
You can mount the Elise 3 Server (AIWS2 Hardware) horizantally or vertically on a 19 " wall
mounting or a rack mounting. You can also mount the module side-by-side or back to front in
the rack,
Wall mounting
Note:
Four screws size 3,5×40 together with four wall plugs and four screws size M3×6,
Note:
are delivered with the product. The M3×6 screws are used for attaching the
assembly brackets to the module. Use the 3,5×40 screws for walls made of wood.
For walls made of concrete and bricks use them together with the wall plugs. For
other types of walls use suitable screws and plugs according to wall material.
!
Important:
When mounted on a wall, ensure that the connections are located in a vertical
Important:
plane to fulfil the fire classification requirements.
1. Fasten the supplied assembly brackets on the bottom side of the module.
2. Use the supplied screws and wall plugs (or other suitable screws and plugs dependent on
wall material) and mount the module as shown in the picture below.
Avaya DECT R4 - Installation and Maintenance Guide
Mounting
on page 580.
Basic configuration
Installing the Elise 3 Server (AIWS2 Hardware)
on page 571.
Supply voltage
on page 576.
Accessing the Elise 3 Server (AIWS2
on page 586.
Connectors, LEDs and buttons
on page 560.
571
02/2016

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents