Installing Elise 2 Server (AIWS Hardware)
4. Attach the LPB on the Elise 2 Server (AIWS Hardware) circuit board. Carefully line up the
male connector pins of the LPB with the female connector of the Elise 2 Server (AIWS
Hardware), then press the LPB down firmly. (To avoid misalignment, the pin 12 on the J3
connector of the LPB is cut off and the corresponding hole on the J9 connector of Elise 2
Server (AIWS Hardware) plugged). See
Figure 186: Mounting of LPB on Elise 2 Server (AIWS Hardware) circuit board
5. Connect cables to the screw connector J1. Use max. 2 x 0.8 mm wires per connector. Strip
the outer sheath of the cables to a length of about 10 Communication Manager. Only use
pins 1 and 2 for connection of the LON bus in/out. (Pins 3 and 4 can be used for
connection of other LON devices, for example SLA). See
Figure 187: Cabling of screw connector J1
Max. 2 x 0.8 mm ø wire
at each connector. Strip 10 cm
6. Replace all removed connectors
7. Close the cover and restart Elise 2 Server (AIWS Hardware), see
restarting the Elise 2 Server (AIWS Hardware)
556
Avaya DECT R4 - Installation and Maintenance Guide
figure 186
J1
1 2
3 4
teleCARE M LON
below.
figure 187
below.
033
Powering down and
on page 527.