Avaya DECT R4 Installation And Administration Manual page 555

Hide thumbs Also See for DECT R4:
Table of Contents

Advertisement

LEDs
LED1
LED2
LED3
LED4
LED5
LED6
Status indication of LPB
LED3
Sequence
Status 1 Indication (LED3)
1
2
3
4
5
LED6
Sequence
Status 2 Indication (LED6)
1
2
Each segment = 250 ms
Installation of LPB
!
Important:
Always follow the instructions in
Important:
(AIWS Hardware)
Server (AIWS Hardware).
1. Remove the cover from the Elise 2 Server (AIWS Hardware), see
page 533
2. Perform a power down of the Elise 2 Server (AIWS Hardware), see
page 527
3. Lift off the screw connector J1 from the LPB
Avaya DECT R4 - Installation and Maintenance Guide
LON Rx
LON Tx
See table for LED3 in
Rx data transfer
Tx data transfer
See table for LED6 in
Each segment = 100 ms
Searching for baudrate. No connection with
NSS/ISC main board
Normal operation. Connection with NSS/ISC
main board (LON Protocol running)
on page 527 when disconnecting the power to the Elise 2
Status indication of LPB
Status indication of LPB
Function
Power up (On momentarily)
Normal operation (Off continously)
Watch-dog reset
Unconfigured (Neuron uC)
No application (no Neuron firmware)
Function
Powering down and restarting the Elise 2 Server
LON Piggy Back Circuit Board (LPB)
on page 555
on page 555
Opening the housing
Power Down
02/2016
on
on
555

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents