Mitsubishi GOT1000 Series Connection Manual page 1175

Graphic operation terminal
Hide thumbs Also See for GOT1000 Series:
Table of Contents

Advertisement

30.3 Preparatory Procedures for Monitoring
The following shows the procedures to be taken before monitoring and corresponding reference sections.
Connect the MITSUBISHI PLC to the 1st GOT.
(2nd GOT)
Install the OS onto the GOT.
Make sure that the OS is installed on the GOT.
Set the communication interface. (Communication
settings)
Download the project data.
Attach the communication unit and connect the cable.
Make sure that the GOT recognizes the connected
equipment.
Make sure that monitoring is performed normally.
Chapter 3 DIRECT CONNECTION TO
CPU
Chapter 4 COMPUTER LINK
CONNECTION
Section 30.3.1
Installing OS onto GOT
Section 30.3.2
Checking OS installation on GOT
Section 30.3.3
Setting communication interface
(Communication settings)
Section 30.3.4
Downloading project data
Section 30.3.5
Attaching communication unit and
connecting cable
Section 30.3.6
Verifying GOT recognizes connected
equipment
Section 30.3.7
Checking for normal monitoring
30.3 Preparatory Procedures for Monitoring
25
26
27
28
29
30
31
30 - 5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents