Gestetner A193 Service Manual page 774

Table of Contents

Advertisement

D-Channel Layer 1 Dump List
How to Read the Dump List
3. Termination Procedure from the NT
The termination procedure starts from
synchronized status ("F7"status for the
TE and "G3" status for the NT).
To terminate the physical connection,
the NT just stops sending signals and
changes to "G1" status. (The INFO0
signal means no signal is sent from
the NT.) Then, the TE also stops send-
ing signals and changes to "F3" status.
SM
TE
F 7
F 3
A-9
NT
G 3
G 4
T2
G 1
G 1
H143X512.wmf
APPENDIX A

Advertisement

Table of Contents
loading

This manual is also suitable for:

A224

Table of Contents