Weinmann OXYWAY Fix I Service Manual page 23

Pressure reducer
Table of Contents

Advertisement

Back
Forward
7.3 Required test and auxiliary
equipment
• Leak detection spray 502
• LPA cap, G 3/8" 503
• Brush
• Cloth
• LPA shut-off valve, G 3/8" internal thread - G 3/8" external
thread 508
• LPA cap, UNF 9/16" 504
• LPA adapter, G 3/8" internal thread - CGA V-5 external thread
(UNF 9/16") 507
• Set, supply test 501
• Special kit, ventilation test kit and pressure reducer Flow 500
• Oxygen cylinder 509
• Testing devices:
Flow measuring tube 0 to 20 l/min 510
Flow measuring tube 0 to 220 l/min 511
Pressure gauge 513
Or
Ventilator tester
7.4 Preparing the final inspection
1. Enter the serial number of the pressure reducer in the test report.
2. Check the pressure reducer for external damage.
Requirement:
The pressure reducer shows no signs of external damage.
3. Check the label 116 on the pressure reducer
(see "18.5 Labels for pressure reducers", page
Requirement:
The label 116 on the pressure reducer is present and legible.
4. Check the serial number embossed on the pressure reducer
for legibility.
Requirement:
The embossed serial number is legible.
5. Check the connection thread on the pressure reducer.
To do so:
• Screw the cap 504 onto the inhalation outlet 106.
Or
Screw the adapter 507 onto the pressure outlet 105.
Contents
Final inspection OXYWAY Fix I, OXYWAY Fix III
242).
OXYWAY
Previous page
EN
23
Next page

Advertisement

Table of Contents
loading

Table of Contents