When Loading Two 190 Series Endoscopes - Olympus OER-Pro Operation Manual

Endoscope reprocessor
Hide thumbs Also See for OER-Pro:
Table of Contents

Advertisement

Chapter 4 Reprocessing Operations
Endoscope connector of
the first endoscope
1
190 series endoscopes may not be available in some areas.
98
 When loading two 190 series endoscopes
When placing the endoscope connector of the second
endoscope, hold the endoscope connector of the first
endoscope to avoid contact. Otherwise, the endoscope
connector of the first endoscope may be damaged by the
contact with S-cord connector mount of the second
endoscope.
As shown in Figure 4.21, put the endoscope connector of the second endoscope
in place while slightly lifting the endoscope connector of the first endoscope to
the left (direction of arrow 1).
1
Figure 4.21
ENDOSCOPE REPROCESSOR OER-Pro Operation Manual
1
Put the endoscope
connector of the second
endoscope in this area
Endoscope connector of
the second endoscope
S-cord connector mount
Place the universal cord on the
inside of the hook

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents