Olympus OER-Pro Operation Manual page 120

Endoscope reprocessor
Hide thumbs Also See for OER-Pro:
Table of Contents

Advertisement

Chapter 4 Reprocessing Operations
114
Before starting the reprocessing process, always confirm the
Program No. display of the main control panel and the INFO
display (WASH/CYCLE, DIS/DAY, TEMPC) of the
subcontrol panel. Press the INFO SEL on the subcontrol
panel to select PROGRAM INFO and check the cleaning
time, disinfecting time, and disinfectant temperature. Then,
press the INFO SEL again to select LCG USAGE and check
the disinfection operation count and elapsed day count. If
disinfection operation count or elapsed day count is not
properly, the endoscope may not be sufficiently reprocessed.
1.
Press the PROG button on the main control panel to select a program [1] to
[3].
Figure 4.34
2.
Press the START button on the main panel. In about 10 seconds, the water
supply starts and the TIME/CODE display shows the remaining
reprocessing time.
Figure 4.35
ENDOSCOPE REPROCESSOR OER-Pro Operation Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents