Endoscope Setup Sequence And Positions - Olympus OER-Pro Operation Manual

Endoscope reprocessor
Hide thumbs Also See for OER-Pro:
Table of Contents

Advertisement

Chapter 4 Reprocessing Operations

Endoscope setup sequence and positions

(5) Control section
(2nd endoscope)
(3) Universal cords
(1st and 2nd endoscopes)
When placing one endoscope, place the
components in the reprocessing basin in the
following order:
(1) Control section (1st endoscope)
(2) Insertion tube
(3) Universal cord
(4) Endoscope connector
92
(4) Endoscope connector
(1st endoscope)
(1) Control section
(1st endoscope)
Figure 4.11
(1st endoscope)
ENDOSCOPE REPROCESSOR OER-Pro Operation Manual
(6) Endoscope connector
(2nd endoscope)
(2) Insertion tubes
(1st and 2nd endoscopes)
When placing the second endoscope, place
the components in the reprocessing basin in
the following order:
(5) Control section (2nd endoscope)
(2) Insertion tube
(3) Universal cord
(6) Endoscope connector
(2nd endoscope)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents