Olympus OER-Pro Operation Manual page 135

Endoscope reprocessor
Hide thumbs Also See for OER-Pro:
Table of Contents

Advertisement

1.
Make sure that the program number on the main control panel shows the
selected program number and the TIME/CODE display shows [- -] that the
reprocessing process is completed.
2.
Step on the foot pedal to open the lid.
3.
Check the condition of the connecting tubes.
4.
Disconnect the connecting tubes and leak test air tube from each
endoscope.
5.
Take the endoscopes and valves out of the reprocessing basin. Wipe off
any water using a piece of sterile gauze. Attach the auxiliary water inlet cap
to the auxiliary water inlet.
6.
Store the endoscopes and valves in a clean place.
7.
Take the connecting tubes and leak test air tubes out of the reprocessing
basin, wipe off any water using a piece of sterile gauze, and store them in a
clean place.
ENDOSCOPE REPROCESSOR OER-Pro Operation Manual
Prevent water from getting into the leak test air tube or the
endoscope may be damaged the next time it is used.
 The connecting tubes should not be bent.
 The connecting tubes should be connected firmly to the
connectors.
 The connecting tubes should be free of abnormalities
including cracks, scratches, etc.
Chapter 4 Reprocessing Operations
129

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents

Save PDF