Olympus OER-Pro Operation Manual page 64

Endoscope reprocessor
Hide thumbs Also See for OER-Pro:
Table of Contents

Advertisement

Chapter 3 Inspection Before Use
58
9.
Press the pin on the center of the metal connector of the leak test air tube to
confirm air supply.
Figure 3.23
10.
Disconnect the leak test air tube from the reprocessing basin's leak test
connector.
11.
With another leak test connector (black), confirm air supply by repeating
from Step 7 to 10.
Figure 3.24
ENDOSCOPE REPROCESSOR OER-Pro Operation Manual
Pin

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents