Olympus OER-Pro Operation Manual page 70

Endoscope reprocessor
Hide thumbs Also See for OER-Pro:
Table of Contents

Advertisement

Chapter 3 Inspection Before Use
64
1.
After starting the endoscope reprocessing or disinfection of the water supply
piping, firmly pinch the test strip end (opposite side of the reaction zone)
with the test strip forceps. Pull the test strip gently to make sure it is properly
pinched.
Figure 3.28
2.
When the disinfectant solution is supplied to the basin, "D" of the process
step indicators and the disinfectant solution heating indicator on the main
control panel blinks.
Figure 3.29
In the case of disinfecting the water supply piping, when the reprocessing basin
is filled with disinfectant solution, three buzzer beeps are generated and the
TIME/CODE display on the main control panel blinks. (State described at
sentence 9 in Section 7.3, "Disinfecting the water supply piping" on page 202.)
ENDOSCOPE REPROCESSOR OER-Pro Operation Manual
Reaction zone

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents