Chrysler 2005 Crossfire SRT6 Service Manual page 1647

Table of Contents

Advertisement

ZH
TESTING FOR A VOLTAGE DROP
1. Connect the positive lead of the voltmeter to the
side of the circuit closest to the battery.
2. Connect the other lead of the voltmeter to the other
side of the switch, component or circuit.
3. Operate the item.
4. The voltmeter will show the difference in voltage
between the two points.
CONNECTOR
REMOVAL
1. Disconnect battery.
2. Release Connector Lock(2).
3. Disconnect the connector(3) being repaired from its
mating half/component.
4. Remove the dress cover(1) (if applicable).
5. Release the Secondary Terminal Lock, if required.
6. Position the connector locking finger away from the
terminal using the proper special tool. Pull on the
wire to remove the terminal from the connector.
INSTALLATION
1. Insert the removed terminal in the same cavity on the repair connector.
2. Repeat steps for each terminal in the connector, being sure that all wires are inserted into the proper cavities.
For additional connector pin-out identification, refer to the wiring diagrams.
3. When the connector is re-assembled, the secondary terminal lock must be placed in the locked position to pre-
vent terminal push out.
4. Replace dress cover (if applicable).
5. Connect connector to its mating half/component.
6. Connect battery and test all affected systems.
8W-01 WIRING DIAGRAM INFORMATION
8W - 01 - 11

Advertisement

Table of Contents
loading

Table of Contents