Honda Prelude 1993 Service Manual page 460

Hide thumbs Also See for Prelude 1993:
Table of Contents

Advertisement

Transmission Assembly
19. Install the slave cylinder, then install the clutch pipe
joint and stay.
CAUTION: Take care not to bend the clutch pipe.
lnstallation (cont'dl
tP/N 08798 - 9002)
8 x 1.25 mm
22 N.m
{2.2 kg-m, 16lb-ft}
20. Install the vehicle speed sensor (VSS)/power steer-
ing speed sensor, then connect the VSS connector'
I x 1 .25 mm
19 N.m 11.9 kg-m, 14lb-ft)
Mr"'
S CONNECTOR
POWER STEERING
SPEED SENSOR
13-44
I x 1 .25 mm
22 N.m 12.2 kg-m, 16 lb'ft}
6 x 1 . 0 m m
10 N.m {1.0 kg-m,
7 rb-ft}
21. Install the shift cable and select cable to the shift
lever and to select lever respectavely.
CAUTION: Tako care not to bsnd the cabl€s.
NOTE:
! Check that the new cotter pin is seated firmly.
. Turn the boot of the shift lever so the hole is fac-
Ing down.
I x 1.25 mm
{P/N 08798 - 90021
COTTER PIN
Replace-
STEEL
WASHER
PLASTIC
WASHER
SELECT
CABLE
CABLE
)
WASHER
WASHER
22. Connect the transmission ground cable and back-up
light switch connectors.
23. Installthe wire harness clamp.
24. Install the starter motor, then connect the starter
motor cables.
N O T E : W h e n i n s t a l l i n g t h e s t a r t e r m o t o r c a b l e ,
make sure that the crimped side of the ring terminal
is facing out (see section 23).
6 x 1 . 0 m m
l0 x 1.25 mm
io r'i'"'ii.i 11n--, t 'o-ft1 45 N'm
(il5 ks-m, 33 lb-ft|
fnt$rtt ,"o""",..to"
GROUND
CABLE
COTTEB PIN
Replace.
BOOT
SHIFT LEVER
54 tb'ft)
rb-ft)
MOTOB
CABLES
WIRE
HARNESS- ,
CLAMP
STARTER
8 x 1.25 mm
22 N.m (2.2 kg-m,
16 tb-ft)
12 x 1.25 mm
75 N.m (7.5 kg-m,
6 x 1 . 0 m m
't0 N.m 11.0 kg-m,7

Advertisement

Table of Contents
loading

Table of Contents