15.5.5.4.4
Configuring the Application Suite
1.
Open the Application Suite and create a new job with any chosen feature check.
Configure the process interface message that is to be transmitted to the PLC.
2.
Save the job on the Vision Sensor.
Activate the Vision Sensor.
3.
The process interface message will be sent to
the PLC and the sent data can be monitored
via Controller tags.
NOTE
In order to ensure data consistency in
the PLC, we recommend the use of the
CPS (Synchronous Copy File) command
when planning using the Rockwell
planning software.
v2.11.0-B4
376/429
Technical Documentation
VeriSens
Baumer Optronic GmbH
Radeberg, Germany
®