Run-time System CODESYS 2.3
3.
To assign a new name to the task (e.g. PLC_Prog), click on "New Task".
Then select the type of task. In this example, this is the "cyclic" type.
Observe the cycle time!
The minimum cycle time for I/O-based tasks is 2 milliseconds (ms)!

Figure 72: Changing Task Names 1