224
Run-time System CODESYS 2.3
3.
To assign a new name to the task (e.g. PLC_Prog), click on "New Task".
Then select the type of task. In this example, this is the "cyclic" type.
Observe the cycle time!
The minimum cycle time for I/O-based tasks is 2 milliseconds (ms)!
Figure 72: Changing Task Names 1
750-8208 PFC200 CS 2ETH RS CAN DPM
Version 1.1.0, valid from FW Version 02.06.20(09)
WAGO-I/O-SYSTEM 750
Manual